ITM Power formally receives £46.5m DESNZ grant to build next-generation Chronos electrolyser manufacturing line in Sheffield
ITM Power, the Sheffield-based hydrogen electrolyser manufacturer listed on the London Stock Exchange, has announced that the £46.5 million grant from the Department for Energy Security and Net Zero (DESNZ), first announced in April 2026, has now been formally awarded. The grant, combined with a £40 million equity investment from Great British Energy, provides the primary financing for ITM Power to establish operational manufacturing capability for its next-generation Chronos electrolyser stack. The Chronos manufacturing line is planned to be built within ITM Power's existing Sheffield facilities, building on production processes already incrementally introduced to the Trident production line. CEO Dennis Schulz described the formal award as enabling the company to proceed with the Sheffield build-out. The combined £86.5 million of public funding from DESNZ and Great British Energy represents a substantial government commitment to domestic green hydrogen manufacturing capacity. The formal grant award converts a previously announced commitment into a binding obligation, triggering the project's next financing and procurement phase. This comes as the wider hydrogen industry has called for stronger government support, and as the UK government looks to its clean energy industrial strategy to stimulate domestic manufacturing supply chains.
Why this matters
The formal award of the DESNZ grant converts a conditional commitment into a live project financing, activating grant agreement execution, state aid compliance review (to confirm the award is consistent with UK subsidy control rules), and procurement documentation for the Sheffield facility build-out. The involvement of Great British Energy as an equity co-investor alongside the DESNZ grant means the transaction structure combines public equity and grant funding, which requires careful governance and reporting obligations. For energy lawyers, this type of government-backed green industrial project is a template for the pipeline of hydrogen and net-zero manufacturing deals expected under the UK's clean energy strategy.
On the Ground
A trainee on this matter would assist with regulatory filing coordination, reviewing the grant agreement conditions and preparing a conditions precedent (CP) checklist to track outstanding obligations before drawdown. Summarising licence condition requirements and cross-referencing them against the project's operational timeline would also be within scope.
Interview prep
Question you might get
“What legal complexities arise when a project is financed through a combination of government grant funding and a public equity investment from a state-backed entity like Great British Energy?”
Sign up free to see the full answer
A model answer you can lift into an interview — how to frame this story for a partner.
Sign up freeMy notes
saved